Flordeliz Guest House

03092011960.JPG

Flordeliz Construction Photos

September 9, 2014 to October 25, 2014 - Page 17

Flordeliz Guest House Construction - Page 1

Flordeliz Guest House Construction - Page 2

Flordeliz Guest House Construction - Page 3

Flordeliz Guest House Construction - Page 4

Flordeliz Guest House Construction - Page 5

Flordeliz Guest House Construction - Page 6

Flordeliz Guest House Construction - Page 7

Flordeliz Guest House Construction - Page 8

Flordeliz Guest House Construction - Page 9

Flordeliz Guest House Construction - Page 10

Flordeliz Guest House Construction - Page 11

Flordeliz Guest House Construction - Page 12

Flordeliz Guest House Construction - Page 13

Flordeliz Guest House Construction - Page 14

Flordeliz Guest House Construction - Page 15

Flordeliz Guest House Construction - Page 16

Flordeliz Guest House Construction - Page 18

Flordeliz Guest House Construction - Page 19

Flordeliz Guest House Construction - Page 20

Started construction on the 20m x 10m Flordeliz Guest House in December 2010. This is the 17th page starting in September of 2014. Click on the links above to see the earlier pictures.

PhilFlagMediumEmbossed.gif

September 09, 2014

Did some landscaping around the yard area.

The first 5 photos show the area around the back gate and the Guest House. The first 3 photos show the back gate/hut area from the Guest House. The fourth photo shows the gardens on the front of the Guest House. The 5th and 6th photos show the back of the Kitchen and end of the Guest House where a wall for flowers and plants has been built. Those are orchids standing on top of the septic tank lid behind the wall.

photo 01.JPG photo 02.JPG photo 03.JPG photo 04.JPG photo 05.JPG photo 24.JPG


The next set of 2 groups of 6 photos each shows the landscaped area around the back gate and the 2-story hut.

photo 11.JPG photo 12.JPG photo 13.JPG photo 14.JPG photo 15.JPG photo 21.JPG

photo 23.JPG photo 41.JPG photo 42.JPG photo 43.JPG photo 44.JPG photo 45.JPG


This set of photos shows the area back towards the main gate. In the 5th photo you can see the front end of the Kia truck we bought to haul building supplies, etc because it was starting to cause too much money for delivery charges and time wasted. It should be noted that already Jovie has changed her mind about this area and has redone most of this area to the right of the main gate. This will be shown in photos past mid-June.

photo 22.JPG photo 31.JPG photo 32.JPG photo 33.JPG photo 34.JPG photo 35.JPG


September 19, 2014

This set of photos shows 3 of our 4 dogs. The German Shepard behind Jovie is Yogi. The small white dog is the terrier, Dexter. AND, the Black Lab cross is Labra. As you can see, Jovie likes Labra a lot and Labra likes her too.

photo 12.JPG photo 11.JPG photo 13.JPG photo 14.JPG photo 15.JPG


The next group of photos shows the work starting on the waterfall for the Koi Pond. The 3rd photo shows the area behind the waterfall that is reserved for the battery building for the windmill and solar panels for electricity. The last photo shows the arbor placement at the other end of the pond from the waterfall.

photo 01.JPG photo 02.JPG photo 21.JPG photo 23.JPG photo 34.JPG


These 3 photos show the area to the right of the main gate where the 2-story native-style living quarters is starting to be built. The superstructure is not native style but standard concrete blocks and concrete pillars. The columns and walls will be covered by natural materials to make it look like a native structure, but its core will last many, many years instead of just 15-20 years for the natural materials. There will be 2 rooms on the main floor and 2 rooms on the 2nd floor with substantial veranda space outside the rooms.

photo 03.JPG photo 04.JPG photo 05.JPG


A good photo of our diesel Kia truck. It can carry 3,350 KG of load. It is the standard canter-style truck with tailgate and drop-sides.

photo 33.JPG


September 24, 2014

The first 2 photos show some progress on the Koi Pond, Waterfall, and Arbor. The 3rd photo shows progress on the walls for the Native Hut.

photo 01.JPG photo 03.JPG photo 02.JPG


September 30, 2014

These photos show the progress on the Waterfall and the Native Hut in just one week.

photo 02.JPG photo 04.JPG photo 03.JPG photo 13.JPG photo 11.JPG photo 12.JPG


October 07, 2014

These photos show the progress on the Waterfall in another week.

photo01.JPG photo02.JPG photo03.JPG photo04.JPG photo12.JPG


The first 3 photos continue to show the Koi Pond and the last photo shows the progress on the Native Hut.

photo13.JPG photo14.JPG photo15.JPG photo11.JPG


October 17, 2014

These photos show loading of the water into the Koi Pond by the Macrohon Fire Department. It is very cheap to get water this way because the Fire Dept. must empty the truck every 30-45 days and re-fill. They are not allowed to put the water back into the reservoir for Macrohon; therefore, they sell the water for a really cheap price. The last 2 photos show the finished arbor area at the end of the Koi Pond.

photo 1.JPG photo 2.JPG photo 4.JPG photo12.JPG photo21.JPG photo22.JPG


October 25, 2014

These photos show the Waterfall running and the 1st small Koi put in the pond. They are only about 4-5" long.

IMG_4571.JPG IMG_4573.JPG IMG_4576.JPG


The 5KW Generator is installed and operational. Our well is now working as well to supplement city water that often runs out of water in the summer hot days. Starting to have architect draw up the main house and pool plans.